Borough of Westville
165 Broadway, Westville, NJ 08093-1148
856-456-0030
856-742-8190
Open: Monday-Friday, 8 am to 4 pm

Temporary Bridge Closing

On Saturday, October 28, 2023 from 7 am to 4 pm, the Route 130 bridge will be closed (in both directions) according to the New Jersey Department of Transportation. Drivers should use the Delsea Drive Bridge over Big Timber Creek during the temporary closure.

Posted on October 27, 2023

I Want To

Download PDF Forms

chevron-down linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram